For correct straw bale installation, lay straw bale walls in “running bond”. This staggers the vertical joins in the straw bale wall, in the same way as in brick walls. I would recommend laying bales on their flat and not on edge.
One edge of the bales has folded straw while the other has clean cut straw ends exposed. When laying the bales, start with the cut edge out for the first row and the cut edge in for the second row, and so on up the wall. The folded side is slightly thicker than the cut edge. Hence alternating avoids problems later on when compressing the bales.
Wet Areas
It is important to create a safety margin between the underside of the straw bales and the floor, especially so in wet areas. In bathrooms, laundries and toilets the law requires that you seal the junction of the floor to the wall. This largely negates the risk of water penetration into the straw bales in these areas. However, it is imperative that there is also a good separation in the kitchen.
The biggest risk of significant water exposure in the kitchen comes from the dishwasher. If, for instance, the hose to the dishwasher were to burst in your absence, the loss of floor coverings as a result would be the least of your concerns. Without good separation of the straw bales from the floor, it is likely that the water damage would be so great as to cause the demolition of the affected walls. It is important to keep in mind that the primary enemy of straw bales is water, whether from condensation or direct water exposure.
In addition to the protection of the bales from the floor, the structure below the straw bales also fixes the straw bale walls to the floor. This bottom boxing structure also forms an important part of the compression process of the straw bales. Compression of the bales is essential to negate the risk of future cracking of the finished walls due to bale settlement. You must compress walls during straw bale installation, as they will settle under their own weight. This natural settling process can take years and result in unsightly cracks in your render.
Bottom boxing in a straw bale wall
The bottom boxing is the structure below the straw bale walls. On my build it is 90mm deep, made up much like a ladder, with structural ply fixed to the top. The bottom boxing has side rails with noggins at 450mm centres, all fixed on edge. Every 1.8m and at the end of the boxing, which adjoins full height openings, I fitted additional noggins on flat. Through these I connected the boxing to the floor, using two 100mm nails per noggin. You can use screws if you prefer.
For fixing to a concrete slab, use two 75mm masonry nails or two 10mm masonry anchors (e.g. Dynabolt). I used 19mm woven polyester strapping to compress the straw bales. The strapping encircles the straw bale wall, travelling under the bottom boxing and over the timber top boxing structure at the top of the wall. The strapping has 1100kg breaking strain and is bright orange in colour. Prior to fixing the bottom boxing to the floor, I laid a length of strapping approximately 2m long on the floor with the bottom boxing fixed over it. I then tied a knot in each end of the strapping to reduce the risk of straps being accidentally pulled out during the rest of the build.
Part of the Anvil building method, is that we use compression strapping over the top and bottom boxing. This is our preferred method of straw bale installation rather than threaded rod or bamboo through the middle of bales.
Boxing insulation
With the bottom boxing fixed to the floor, I then fill the cavities with R2.0 glass batt insulation. Many of our power points are within straw bale walls about 200mm up from the floor. Having the glass insulation enabled the electrician to run cables within the bottom boxing to service these outlets without the need for conduit, as there is no risk of damage to cables encased in this insulated bottom boxing. Place a play top to the bottom boxing, over the insulation. This providing consistent support for the underside of the bales, which in turn enables you to apply significant compression to the straw bale wall.
The bottom boxing is 410mm wide whereas straw bales are 450mm wide. This serves two purposes. Firstly, having the boxing narrower than the bales means the strapping applies pressure to the side of the bales. This helps to hold the bales central on the boxing. Secondly, if driving rain hits the raw straw bales prior to rendering, the 20mm overhang of the straw bales will discharge surface water off the bales onto the ground rather than it gathering on top of the ply covering.
Top Boxing in a Straw Bale Wall
I recommend top boxing 180mm wide; with the top boxing narrower than the bottom boxing. This significant triangulation provides extra lateral stability to the wall. The top boxing is made up of three pieces of 90x45mm pine, with additional blocks of 90x45mm inserted into the top channel of the boxing about every metre. Without these additional blocks, the top edges of the boxing will tend to roll together under compression, weakening the structure.
Over the window and door openings, we built an infill structure to maintain the full-depth appearance of the straw bale wall. The top boxing forms an essential part of the compression of the straw bales. But more so, also provides the majority of the support for this structure. On some occasions, I specify four pieces of 90x45mm nail laminated together for load bearing top boxing. This greater strength supports wider bulkheads.
Intermediate Boxing
This house has a curved roof so the end walls extend higher than the side walls. The side walls are seven bales high, so it is essential that the end walls are also compressed at seven bales high so that everything is tied together. With the need to add extra bales at the end walls up into the gable, I fitted what I refer to as intermediate boxing on the end walls at seven bales high. I connected the side wall top boxing to the end wall intermediate boxing at the corners prior to compression. As I positioned the top and intermediate boxing on top of the straw bale walls, I fitted the compression strapping and pulled it hand tight, which removes the risk of the top boxing falling off and injuring someone during construction.
The junctions of the top boxing and the top boxing to intermediate boxing are securely joined prior to compression. I placed the compression strapping at 450mm centres along the straw bale wall, with a joining buckle at each side of the wall. We tightened the straps three separate times, about 24 hours, apart using tensioning tools. Jan and I did this together, tightening the inside and outside of the strap simultaneously to provide even, vertical compression.
During compression, the strapping will bite into the top boxing and stop slipping after applying some tension. Therefore if I only used one buckle (instead of two) it would not provide even compression to the wall. We applied three compressions of the top and intermediate boxing atop the first seven rows of bales. Then we installed the straw bales to the gable ends. After we filled the cavity at the top of the intermediate boxing with biscuits of straw, the bales are stacked on top. At the top of these additional gable end bales, I installed standard top boxing.
I used compression strapping to compress the top boxing, again at 450mm centres. However, it is essential that this strapping extends to the bottom boxing NOT just to the intermediate boxing. This can be done at an angle if required. The top boxing on our home was made up of many pieces to more closely follow the roof line. After three compressions of the gable end top boxing, I then connected it to the intermediate boxing. This provides stability to the structure.
please can you also.send information on modern mud house construction?
We are so dedicated to straw bale construction that we don’t have any information on mud brick houses, sorry!